Seven priority sites across Orange County. Select a site to jump to its details.

Map of Orange County, NY showing the seven priority brownfield sites, with a detail view of the four sites in Newburgh and New Windsor

Numbers match the site sections that follow. Locations are approximate and plotted from site addresses; four of the seven sites are clustered in the City of Newburgh and Town of New Windsor along the Hudson River (see detail).

Sites at a glance

Assessment status of each site as described in the site summaries. ESA = Environmental Site Assessment.

#SitePhase I ESAPhase II ESACleanupCurrent status / next step
1 Consolidated Iron and Metal1 Washington St, Newburgh Not yetpossible next step EPA RI insteadSuperfund, 2004 Completed2012, for use as passive greenspace Paused while Newburgh selects a new city manager; IDA will then work with the city on next steps, which may include a Phase I.
2 Former Diamond Candle FactoryTown of New Windsor ✓ Completed ✓ Completedtwo Phase IIs None IDA and a planner are drafting conceptual park plans, which will shape the remediation plan and cleanup cost estimate.
3 US Steelways401 S Water St, Newburgh ✓ Completed On hold None Phase II on hold until the Orange County Partnership connects with the owner about his plans and permission to investigate.
4 Orange County FairgroundsCarpenter Ave / Wisner Ave, Wallkill ✓ Completed2025, grant-funded ✓ Completedno obvious concerns None County is identifying development strategies; site is not currently a priority and will be revisited if focus shifts.
5 Former Kolmar Labs100-200 Skyline Dr, Port Jervis ✓ Completed ✓ Completedmore work needed None2 open spills IDA working with the owner on possible building demolition and further investigation to close the two open spills.
6 Galaxy SiteMaybrook ✓ Completed None None $25M FAST NY Shovel Ready grant awarded; Orange County Partnership is working with the owners on development strategy.
7 Shaw Development Site22-42 Johnes St, Newburgh None ✓ Completedseveral Phase IIs BCP pendingRI to follow BCP application submitted and awaiting approval; IDA will fund the Remedial Investigation from its EPA Assessment grant.
CompletedPlanned, pending or on holdNot done / not reportedOther investigation (EPA Superfund)

Site details

History, environmental findings, redevelopment vision and current status for each site.

1

Consolidated Iron and Metal

1 Washington Street, City of Newburgh • EPA Facility ID: NY0002455756

Phase I ESANot yetpossible next step
Phase II ESAEPA RI insteadSuperfund, 2004
CleanupCompleted2012, for use as passive greenspace
OwnerNot stated
Former uses
Industrial site from at least WWI until 1999: shipyard, scrap metal processing, and an on-site smelter (1975–1995).
Contamination
Soil and groundwater contamination identified in EPA Remedial Investigation (2004).
Cleanup
Completed 2012: excavation of contaminated soil and a soil cover system. Ongoing oversight with engineering and institutional controls under the Site Management Plan.
Current use
Green space with a walking path and picnic tables.
Redevelopment goal
Waterfront park / public recreation within the City’s proposed Brownfield Opportunity Area; city envisions using the EPA Superfund Redevelopment Program.
Next step
Redevelopment feasibility study and Phase I ESA, once the new city manager is in place.
View of Consolidated Iron and Metal
Consolidated Iron and Metal — site view

Site history & environmental findings

Consolidated Iron was operated as an industrial site from at least World War I until 1999 including a shipyard and scrap metal processing facility. In addition, a smelter operated on-site between 1975 and 1995. The EPA under the Superfund Program completed a Remedial Investigation in 2004 that identified soil and groundwater contamination related to the former industrial operations. Site remediation was completed in 2012 that included excavation of contaminated soil and the installation of a soil cover system. The Site is subject to ongoing oversight which include engineering and institutional controls indicated in the Site Management Plan. The Site is currently utilized as green space- including a walking path and picnic tables.

Redevelopment vision

The Site is situated within the City’s proposed Brownfield Opportunity Area (NYS Program that includes identification and planning for brownfield sites), which includes goals of improving and expanding recreational activities along the city’s waterfront. Based on public comment during preparation of the Brownfield Opportunity Area the city envisions improving sites along the waterfront including enhanced public access and recreational features to provide public gathering spaces, increase water for use and encourage public activities. The first steps to redeveloping the Site are to conduct a redevelopment feasibility study to determine whether the proposed use of a park will be possible and completing a Phase I ESA to understand the site’s contamination (location, concentration), and restrictions to inform any proposed site reuse. The city envisions utilizing the EPA Superfund Redevelopment Program to assist with the site revitalization.

Current status

The current status is related to Newburgh transitioning to a new city manager. Once the new manager is selected, the IDA intends on working with the city to determine next steps for the site, which may include performing a Phase I.

↑ Back to sites at a glance
2

Former Diamond Candle Factory

Town of New Windsor • Quassaick Creek Gorge

Phase I ESA✓ Completed
Phase II ESA✓ Completedtwo Phase IIs
CleanupNone
OwnerOrange County
Former uses
Paper and woolen mill (early to mid-1900s), then the Diamond Candle Factory until 1980. Most buildings were demolished after several fires.
Contamination
Metals and semi-volatile organic compounds (SVOCs) in soil and groundwater across the site. Two underground tanks: one showed no petroleum impacts; the other sits in an unsafe void space and was not investigated. Tanks must be cleaned and removed.
Redevelopment goal
Public park with creek access; a key Opportunity Site in the Quassaick Creek Greenway Master Plan.
Planned pathway
Enter NYSDEC Brownfield Cleanup Program; conceptual park design with County Planning and Scenic Hudson; seek NYSDEC Environmental Restoration Program or EPA Cleanup Grant funds for remediation and state/federal (incl. Office of Parks and Recreation) funds for the park.
Next step
Finish conceptual plans → draft remediation plan → estimate cleanup costs.
View of Former Diamond Candle Factory
Former Diamond Candle Factory — site view

Site history & environmental findings

The Site, owned by the county, was initially operated as a paper and woolen mill in the early to mid-1900s and later as the Diamond Candle Factory until 1980. Several fires occurred at the Site resulting in the demolition of most of the Site buildings. A Phase I and two Phase IIs have been conducted at the Site. The Phase IIs identified metals and semi-volatile organic compounds in soil and groundwater across the Site. During the Phase IIs, underground tanks were identified and investigated. Petroleum constituents were not identified in the area surrounding one of the tanks. The other tank, visible from the surface, is situated within a void space which is unsafe to investigate. The tanks would need to be cleaned, removed, and properly disposed of prior to or during development. No cleanup work has been completed to-date.

Redevelopment vision

Diamond Candle was identified within the Quassaick Creek Greenway Master Plan and Implementation Strategy as a key Opportunity site. It was noted as one of the most dramatic sites deep within the Quassiack Creek Gorge offering a dramatic industrial history and recovering habitat near with easy creek access along a flat area of bank within the lower gorge area, connected by an existing former roadbed from Columbus Street. The county envisions redeveloping the site as a park with access to the creek however initially site remediation is required to make the site safe for recreational use. Orange County intends to enter the Site into the NYSDEC Brownfield Cleanup program to obtain state oversight and liability protection and work with the County Planning Department and Scenic Hudson to create a conceptual park design that will inform the remediation strategy and provide a basis for park design/construction. Funding for site remediation will be requested from the NYSDEC Environmental Restoration program or EPA Cleanup Grant while park design/construction will be requested from state and federal funding, including through the Office of Parks and Recreation.

Current status

Currently, the IDA is working with a landscape architect to prepare conceptual redevelopment plans for the site. Once these plans are drafted, these plans will be used to draft remediation plans for the Site based on the location of the contamination and the elements of the park. From the remediation plans, costs for the cleanup will be determined.

↑ Back to sites at a glance
3

US Steelways

401 S Water Street, City of Newburgh

Phase I ESA✓ Completed
Phase II ESAOn hold
CleanupNone
OwnerHudson Shipyard LP
Former / current uses
Industrial since the late 1800s (rail lines, coal storage, shipyard). Today: shipyard, steel manufacturing and distribution, and ship repair; underutilized.
Environmental concerns
Phase I flagged the long industrial history and a related on-site spill. Soil and groundwater conditions have not been characterized.
Redevelopment goal
Work with the owner to increase site use and remove environmental barriers, given its size and location.
Next step
Phase II ESA, pending owner agreement.
View of US Steelways
US Steelways — site view

Site history & environmental findings

The underutilized site has been used for industrial purposes dating back to the late 1800s which included the use of rail lines, coal storage, and a shipyard. Currently, the Site is owned by Hudson Shipyard LP and is operating it as a manufacturing and distributing facility for steel. The Site currently consists of a shipyard, steel manufacturing, and ship repair facility. A Phase I was conducted at the Site and identified environmental concerns related to the long history of industrial use and a related spill onsite. A Phase II would be necessary to determine whether these uses have adversely affected site soil and groundwater.

Redevelopment vision

The site is currently underutilized and based on its size and location offer opportunities for increased economic activity. The Orange County Industrial Development Agency and the City envision working with the Site owner to create a plan to increase the site use and remove any environmental barriers to its increased use.

Current status

Currently, the Phase II is on hold until Orange County Partnership can connect with the owner and discuss his plans for the Site and determine whether he would be willing to allow the investigation.

↑ Back to sites at a glance
4

Orange County Fairgrounds

Carpenter Avenue / Wisner Avenue, Town of Wallkill

Phase I ESA✓ Completed2025, grant-funded
Phase II ESA✓ Completedno obvious concerns
CleanupNone
OwnerPrivate
Former uses
Agricultural fairground at this location since 1897; on-site racetrack began as a ½-mile horse track and was used for auto racing by 1919.
Findings
Phase I: historical racetrack operations may have affected soil and groundwater. Phase II: no obvious environmental concerns; localized impacted soils possible but none found.
Redevelopment goal
Economic development, given the site’s location and size; owner is willing to work with the IDA.
Next step
County to identify development strategies.
View of Orange County Fairgrounds
Orange County Fairgrounds — site view

Site history & environmental findings

The Orange County Fairgrounds, privately owned, were established at its current location by the Orange County Agricultural Society in 1897 and utilized as an agricultural fairground. Originally established in 1857, the on-site racetrack was initially a ½-mile horse track and was first used as an automobile racetrack by 1919. A Phase I, conducted in 2025 utilizing the grant, concluded that historical operations as a racetrack may have impacted Site soil and groundwater quality. A Phase II was conducted and did not identify any obvious environmental concerns. There could be localized areas with impacted soils however none were identified during the investigation.

Redevelopment vision

The site was identified as a key site for economic development due to its location and size. The site owner is agreeable to working with the Orange County IDA to identify environmental issues and development the site to the economic benefit of the county. The county is currently identifying potential development strategies.

Current status

Outreach to the Site owner and the County

↑ Back to sites at a glance
5

Former Kolmar Labs

100-200 Skyline Drive, City of Port Jervis

Phase I ESA✓ Completed
Phase II ESA✓ Completedmore work needed
CleanupNone2 open spills
OwnerPrivate
Former uses
Civilian Conservation Corps housing (1930s); Kolmar Laboratories cosmetics manufacturing 1950–1995. Vacant, unsecured and vandalized since 1995; 2023 fire destroyed Buildings 5 and 6.
Contamination
SVOCs and metals in subsurface soil. Transformer PCB oil spill from the 2023 fire (not fully investigated). Petroleum spill linked to a tank.
Open issues
Two open spills (transformer and tank areas) need further investigation to define extent and cleanup requirements.
Redevelopment goal
Hospitality redevelopment; a priority for the City of Port Jervis and the IDA.
Next step
Potential demolition and additional investigation to close the spills.
View of Former Kolmar Labs
Former Kolmar Labs — site view

Site history & environmental findings

The Site was originally developed in the 1930s and used by the Civilian Conservation Corps (CCC) as housing. Kolmar Laboratories obtained the property in 1950, and several additions of industrial buildings occurred between 1951 and 1968 to support Kolmar’s manufacturing of women’s cosmetics products. In 1995, Kolmar consolidated operations to the nearby King Street facility, and the site was abandoned. The Site/buildings have remained vacant and unsecured since 1995 and have been subject to vandalism. In 2023, a fire occurred destroying Buildings 5 and 6, and resulted in a transformer spill of PCB oil. A Phase I and Phase II were conducted and identified SVOCs and metals in subsurface soils related to the former historical use of the Site. PCBs were not identified near the transformer area but were not fully investigated. Additionally, several potential tanks were identified in a previous investigation but were not found during the Phase II. A petroleum spill was reported associated with one of the tanks that would need to be addressed prior to redevelopment. Further investigation of both the transformer and tank areas needs to be conducted to determine the extent of contamination and cleanup requirements in order to close the two spills.

Redevelopment vision & current status

The property is currently a priority for redevelopment for the city of Port Jervis and the IDA due to its potential for redevelopment in the hospitality industry. The IDA is working with the Site owner to determine next steps for the property, including potential building demolition and additional investigation to close the open spills.

↑ Back to sites at a glance
6

Galaxy Site

Village of Maybrook

Phase I ESA✓ Completed
Phase II ESANone
CleanupNone
OwnerPrivate
Former uses
Mostly vacant or undeveloped for 120+ years; some early residential structures and garages, agricultural use in the northeast, and former railroad tracks in the northwest.
Environmental concerns
Observed dumping; metals in soil above regulatory standards in part of the site; former railroad tracks.
Redevelopment goal
High-tech advanced manufacturing, supported by a $25M FAST NY Shovel Ready grant.
Next step
Orange County Partnership developing strategy with site owners
View of Galaxy Site
Galaxy Site — site view

Site history & environmental findings

The Site has consisted predominantly of vacant or undeveloped land for at least the past 120 years, with a few exceptions. By at least 1902, the area adjacent to the southern portion of the Site had been developed with 1st Street and 2nd Street extending north from Decker Street. Residential development associated with these roadways was located primarily offsite; however, garages and at least one two-story building appear to have been located on the southern portion of the site. In addition, several residential structures were present along Barron Road, some of which may have been situated within the Site boundaries. The northeastern portion of the Site appears to have been used for agricultural purposes during this period. A Phase I has been conducted and identified environmental concerns related to observed dumping, confirmed metals impacts to soil at concentrations exceeding applicable regulatory standards in a portion of the Site, and former railroad tracks located in the northwestern portion of the Site.

Redevelopment vision & current status

The Site has been awarded a $25M Fast NY Shovel Ready grant to support development in high-tech advanced manufacturing. The Orange County Partnership is working with the Site owners to strategize development opportunities.

↑ Back to sites at a glance
7

Shaw Development Site

22-42 Johnes Street, City of Newburgh

Phase I ESANone
Phase II ESA✓ Completedseveral Phase IIs
CleanupBCP pendingRI to follow
OwnerPrivate
Former uses
Moulding and planing mill with lumber yard (1880s–1910s), later a dress factory and plumbing supply business; commercial use since at least 1966. Currently vacant.
Contamination
Metals and SVOCs in soil above regulatory standards.
Redevelopment goal
Housing, after remediation under the NYSDEC Brownfield Cleanup Program.
Next step
BCP acceptance, then a Remedial Investigation funded through the IDA’s EPA Assessment grant.
No site photo available

Site history & environmental findings

The earliest available record, the 1884-1890 Sanborn Maps depicted the Site as Shaw’s Son’s Moulding and Planing Mill, consisting of a lumber yard, 2-story lumber sheds and a 2-story commercial structure. The 1913 Sanborn Map depicted the Site as Newburgh Planing Mill Company and contained a dry kiln room and a waste vault. The 1957 Sanborn Map labeled the Site as a ‘Dress Factory’, with plumbing supply offices; depicted three (3) individual storage structures on the east/southeast section of the Site; and a small rectangular structure labeled ‘pipe fitting bins’ is depicted on the eastern section of the Site. This structure and use are consistent as viewed in Sanborn Maps dated 1967 – 1971 and aerial photographs dated 1965 – 1995. Aerial photographs dated 2004 – 2017, depict the Site that is similar in size and footprint to the present-day structure. According to the City Directory, the structure has been used for commercial purposes as early as 1966 and is currently vacant. Several Phase II investigations have been conducted at the Site and determined that Site soils are impacted with metals and SVOCs above applicable regulatory standards.

Redevelopment vision & current status

The owners of the Site intend to remediate the Site under the NYSDEC BCP program for subsequent redevelopment as housing. An application for the BCP has been submitted and is awaiting approval. The Site will require a remedial investigation (RI) once it has been accepted into the program. The IDA has agreed to support the project by appropriating some funds from their EPA Assessment grant for the RI.